Industrial electrical estimating

We estimate electrical work for plants, warehouses, distribution centres and process expansions in Ontario: 600 V distribution, motor feeds and controls, cable tray, high-bay lighting, heat tracing and equipment connections. Estimates are priced in Accubid Pro, with labour adjusted for heights, lifts and work around production.

What we count and measure

Industrial scopes are driven by equipment and distances. We take both from every discipline's drawings, not only the E-sheets.

Industrial electrical scope we estimate
ScopeCountedMeasured
DistributionSwitchgear, MCCs, transformers, panelboards, disconnectsFeeders by size and wiring method, bus duct
Motor feedsStarters, VFDs, local disconnects, terminationsPower and control conductors to each motor
Cable tray and supportsFittings, drops, hangers, supportsTray by width and type, cable in tray
LightingHigh-bay and task fixtures, controls, emergencyBranch circuits at working height
Mechanical connectionsEquipment from the mechanical schedulesFeeds and flexible connections
Heat tracingControllers, power connection kits, end sealsHeat trace cable by pipe run
Grounding and bondingGround rods, bonding connections, test wellsGrounding conductors and grid

Where industrial labour goes wrong

Material in an industrial estimate is usually easy to count. The risk is in labour, and in the scope that sits between trades.

Heights, lifts and access

Tray at 9 m, fixtures in a 12 m warehouse and conduit over running equipment all take longer than the same work at 3 m. We apply height and access factors by area, from the sections and elevations, and list them so you can match them to your own experience.

Shutdown windows and production

Tie-ins to existing distribution often have to fit a weekend shutdown. Tell us the windows and access limits, or where they are in the documents, and we price the overtime and crew size they force.

Mechanical control wiring and heat tracing

Control wiring for mechanical and process equipment is sometimes in Division 26, sometimes in Division 23, and sometimes split between them. We read both, state which we carried, and raise an RFI where the documents contradict each other. Heat trace circuits are taken off by pipe run from the mechanical drawings.

Hazardous locations

Where an area classification is shown, we price the wiring methods, seals and fittings it requires. If process equipment suggests a classification the drawings do not show, we raise it before you bid.

Industrial questions

All questions and answers

Do you estimate hazardous location electrical work?

Yes, when the area classification is shown in the documents. We price the wiring methods, seals and fittings the classification requires, and raise an RFI if a classification is missing where process equipment suggests one.

Can the estimate account for shutdown windows and work around production?

Yes. Tell us the shutdown windows and access limits, or point us to them in the documents. We adjust labour for compressed schedules, overtime and restricted access and list those adjustments separately.

Send the drawings. Get a fixed price within one working hour.

Tell us your bid closing. If we cannot meet it, we say so before any work starts. And if the general contractor later questions your price, we defend it with you.